In just over a month, this London office site has undergone a dramatic transformation, with an additional three storeys added using more than 900 steel lifts.
7,000m² of metal decking has been installed and fully concreted, with 950m³ poured to bring the structure to life and complete the new levels.
This development is taking shape at an impressive pace—stay tuned for more updates coming soon!

