Buchanan Wharf Takes Shape

Buchanan Wharf

Buchanan Wharf continues to dramatically change Glasgow’s Riverfront.

The Drum Property development includes a 7-storey and a 10-storey office block, comprising of over 320,000ftof Grade A office space.

Building One and Building Two are now being erected simultaneously with Building One achieving its full height within numerous zones. The steel frame of Building Two began to take shape in July and is rapidly gaining height.

Throughout the project, BHC are supplying, fabricating and erecting over 4,000 tonnes of steelwork across the two offices. In addition to the steelwork, BHC are installing 31,673m2 of metal decking topped with 4,320m3 of concrete reinforced with 309 tonnes of reinforcement.

The latest images from site:

Buchanan Wharf, Glasgow

Buchanan Wharf, Glasgow

Buchanan Wharf, Glasgow