Project Details:

Hot Rolled Steelwork:

227 tonnes

Cold Formed Steelwork:

22 tonnes

Client:

Parcelforce

Main Contractor:

Dawn Construction Ltd.

Architect:

Cooper Cromar

Structural Engineer:

URS Consulting Engineers

References:

Mark Cox
(Site Agent)
Dawn Construction

Eddie Robertson
(Divisional Manager)
Dawn Construction

parcelforce cambuslang structural steelwork project

Parcelforce, Cambuslang

This project consisted of the supply and erection of a 53.5 metre clear span portal frame with a small mezzanine office floor.

BHC Ltd. supplied and erected hot rolled steelwork and contractor designed cold formed purlins and siderails for the project.
 
Using our own in-house steel erection squads, mobile cranes and mobile elevated working platforms, augmented with hired plant, BHC Ltd. completed the erection of the hot rolled portal frame steelwork and cold rolled purlins and siderails one week ahead of schedule and on budget.