Project Details:

Hot Rolled Steelwork:

702 tonnes

Cold Formed Steelwork:

40 tonnes

Precast Planks:

7956 m²

Precast Stairs & Landings:

9 No.

Precast Lift Cores:

2 No.

Edge Protection:

1366 m

Client:

Highland Council

Main Contractor:

Morrison Construction Services

Architect:

Keppie Architects

Structural Engineer:

A F Cruden Associates

References:

David Ross
(Commercial Manager)
Morrison Construction

Kevin Minnock
(Project Manager)
Morrison Construction

Henry Unwin
(Package Manager)
Morrison Construction

millburn academy structural steelwork

Millburn Academy

Millburn Academy is a new-build school to replace the existing school, which is  adjacent to the new site.

The school has two storeys with dual-pitched roofs and two teaching wings.
 
BHC Ltd. supplied and erected hot rolled steelwork and cold formed purlins for the project. We also installed the precast lift structures supplied by Waycon Precast Concrete Lift Shafts; supplied and installed Combisafe edge protection to the perimeter; scaffold edge protection to the voids; and supplied and installed all the precast concrete floor planks and stairs.

millburn academy structural steelwork project