Project Details:

Hot Rolled Steelwork:

509 tonnes

Cold Formed Steelwork:

81 tonnes

Client:

Goodrich Industries Ltd.

Main Contractor:

Dawn Construction Ltd.

Architect:

Bradford Robertson Architects

Structural Engineer:

URS Consulting Engineers

References:

Stephen Loagan (Site Agent)
Dawn Construction Ltd.

David Boyle (Site Agent)
Dawn Construction Ltd.

Eddie Robertson (Divisional Manager)
Dawn Construction Ltd.

goodrich industries prestwick structural steelwork project

Goodrich Industries: Prestwick
Phase 2

The Goodrich Phase 2 project consisted of a portal frame extension to the existing Goodrich facility that BHC Ltd. designed and built in 2003.

Phase 2 involved the supply and erection of a 90 metre triple span portal frame 131.75 metres long with a typical bay size of 7.75 metres.

Competitive Design

The structural engineers URS adopted BHC's design principles from Phase 1 in order to keep the construction costs to a minimum, as BHC had provided a very competitive design for the initial phase.

BHC supplied and erected hot rolled steelwork and contractor designed cold formed purlins and siderails for the project.

goodrich industries prestwick structural steelwork

Completed on time and on budget

Utilising our own in-house steel erection squads, mobile cranes and mobile elevated working platforms augmented with hired plant, BHC were able to complete the erection of the hot rolled portal frame steelwork and cold rolled purlins and siderails using three erection squads on time and on budget.

goodrich industries prestwick construction project