Project Details:

Hot Rolled Steelwork:

678 tonnes

Cold Formed Steelwork:

54 tonnes

Precast Planks:

7461 m²

Precast Stairs & Landings:

8 No.

Precast Lift Cores:

2 No.

Edge Protection:

1191 m

Client:

Highland Council

Main Contractor:

Morrison Construction Services

Architect:

Keppie Architects

Structural Engineer:

A F Cruden Associates

References:

Martin Murphy
(Commercial Manager)
Morrison Construction

Lonie MacIntosh
(Project Manager)
Morrison Construction

Henry Unwin
(Package Manager)
Morrison Construction

dingwall academy structural steelwork project

Dingwall Academy

Dingwall Academy is a new-build school to replace the existing school, which is  adjacent to the new site.

The school has two storeys with dual-pitched roof and a mono-pitched roof over the games hall area.
 
BHC Ltd. supplied and erected hot rolled steelwork and cold formed purlins for the project. We also installed the precast lift structures supplied by Waycon Precast Concrete Lift Shafts; supplied and installed Combisafe edge protection to the perimeter; scaffold edge protection to the voids; and supplied and installed all the precast concrete floor planks and stairs.

dingwall academy construction project

Health and Safety is of paramount importance to BHC and our Combisafe edge protection installation service ensures regulation compliance, whilst maintaining efficiency and cost-effectiveness.