Project Details:

Hot Rolled Steelwork:

948 tonnes

Cold Formed Steelwork:

6 tonnes

Metal Decking:

9,100 m²

Edge Protection:

1,900 metres

Client:

Wilson Bowden Developments

Main Contractor:

Balfour Beatty

Architect:

Building Design Partnership

Structural Engineer:

Struer Consulting Engineers

References:

Stephen Murray (Project Manager)
Balfour Beatty

Joe Duffy (Site Manager)
Balfour Beatty

Davie Christie (Commercial Manager)
Balfour Beatty

atlantic quay structural steelwork project

Atlantic Quay:
Glasgow
Building 4

This project involved the construction of a multi-storey office block in Glasgow city centre. Careful planning was required due to difficulties caused by site logistics.

This project was erected utilising the main contractor's tower crane, our own in-house steel erection squads, metal decking squads, and mobile elevated working platforms. Erection was also augmented with our own mobile crane in the first phase, in order to progress the project in the most efficient fashion.

structural steelwork

Hoisting a major structural component gets underway – carefully.